김제시

Industrial research site

  • Area: 41.7㎢
  • Develop as an industrial cluster of major industry, new growth engine industry and related research facilities
  • Develop as a site for coping with individual investment demand of national and international anchor enterprises, integrated complex development demand with the related enterprises, etc.
Industrial complex(18.5㎢) is in the process of reclamation and construction work divided into 9 areas(Korea Rural Community Corporation)
  • Zone 1(1.8㎢) will finish the development(‘15.12), and zone 2(2.6㎢) plans to finish the development until 2017
  • Zone 3~9(14.1㎢) will be completed until 2018

International cooperation site

  • Area: 52.0㎢
  • Promote the complex development of industry, distribution, international cooperation, culture and tourism function, international service function, etc. and develop as a base and central area symbolizing Saemangeum in long term
  • Prior review of the development of special competition and cooperation zone through cooperation among nations
  • Step 1 leading reclamation : 6.6㎢ (about 2,000,000 pyeong)
Main introduction of cutting-edge knowledge-based industry, R&D, international cooperation, culture and tourism function and city service function

Tourism and leisure site

  • Area: 36.8㎢
  • Develop as the large scaled tourism and leisure facilities integrated district by global tourism capital
  • Induce in order to promote the development with identity while maintaining mutual contact of each district through the differentiation of introduction function by specific districts
(Tourism-leisure 1) Promotion of part site (1.1㎢) to leading business (Jeonbuk construction development)
  • Arrange the anchor facilities including large scaled complex resort, accommodation, shopping, cultural facilities, etc. to be integrated
(Gogunsan Islands) Arrange marine leports and experiential tourism functions in the center
(Sinsi ~ Yami site) Arrange the functions of entertainment facilities such as marine theme tour and theme park in the center and promote the activation of medical tour connected with nature landscape, recreational facilities, etc.

Agricultural science site

  • Area: 94.3㎢
  • Promote the representative agriculture and science cluster of our country through complexation of the various functions including eco-friendly high quality and high tech agriculture, export-oriented agricultural industry, R&D and agriculture service support, agricultural ecology tour, etc.
Korea Rural Community Corporation as a project operator is developing the site
  • *Plan to be completed until 2020
Brea water bank(62.1km) 11 zones
  • Completion among 54.2km long 9 zones of the leading sections
  • Two unfinished zones Mangyeong 2 and zone 6)
  • Brea water bank in Gimje area [commencement of work of Mangyeong zone 6(‘17.4)]

Environmental ecology site

  • Area: 42.0㎢
  • Introduction of four functions of formation of new nature, creating ecology restoration, ecological water purification and ecological tourism environment education
  • Plan to divide the district into core are, buffer area and transition area in order to be in balance of preservation and use
Promoting the development of ecological wetland
  • In the process of working design after completing(’14.11) preliminary feasibility of some areas(0.81㎢)(Saemangeum Regional Environmental Office)
Develop as a nature-friendly space by connecting with other development site

Backup city site

  • Area: 10.0㎢
  • Set up tourism, leisure and commercial business functions integrated district and promote the development of waterside tour base using waterfront, etc.
Plan to develop as a back-up residential area for the activation of Saemangeum after 2020
Plan to make a high-tech luxury city using the waterfronts near Mangyeonggang River

Saemangeum new port construction project

  • Business period : 2009~2030(step 1 2009~2023)
  • Operating expense: 2 trillion 6,055 hundred million won
  • Contents of business : 18 ships, 3.5㎞ long sea wall, 14.4㎞ long revetment and 3.3㎞ long road
    • ※ Step 1 : 4 ships, 3.1㎞ long sea wall and 0.5㎢ long port site

Saemangeum inner expressway

Dongseo biaxial road
  • Business period : 2015~2020
  • Scale of business : 20.4㎞(four-lane and road for the exclusive use of motor vehicles)
  • Business expense : 340.9 billion won (86.7 billion won budget of '18)
Nambuk biaxial expressway
  • Business period : 2016~2023
  • Scale of business : 26.7㎞(six~eight-lane)
  • Operating expense: 9.095 hundred million won
    • ※ Step 1 (zone 3·4) commencement of work(‘17.12)

Saemangeum highway construction project

  • Business period : 2013~2022
  • Scale of business : 55.09㎞(four-lane)
  • Business expense : 1 trillion 9,241 hundred million won(138.9 billion won budget of ‘18)
    • * Gimje Simpo Port~Wanju Sanggwan(commencement of work in ‘18.11)

Development of Saemangeum Korea·China cooperation complex

  • Location : In the international cooperation site(special zone of competition and cooperation)
  • Scale : 300~500ha(900,000~1,500,000)
  • Create the special cross-border open economic zone including international industry·distribution, international service cooperation, etc.
    • ※ Announced outpost for entry to China on September 5th, 2014(Ministry of Strategy and Finance)

Promotion of Saemangeum base international airport

  • Location : Saemangeum back-up city site
  • Scale : 1,000ha(distribution+MRO)
  • Function : Distribution international airport(harbor·railway·land) → Promote the 5th long-term comprehensive plan for airport development

Seed research complex development project

  • Business size : 166ha(500,000 pyeong)
  • Create the best seed industry cluster in Northeast Asia
  • R&D, seed process, distribution and export complex, etc. → Saemangeum master plan(MP) new project reflection(September, 2014)

National project of Saemangeum Arboretum

  • Business period : 2018~2026 *plan to open in 2027
  • Scale of business: 123.5 billion won (151ha)
  • Business location : Agricultural science site zone 6-1
  • Contents of business : The world’s first coast·salt·hydrophilic multi-function reclamation forest, world marine theme exhibition center, coast research forest, tidal flat eco park, etc.
    • * Passed preliminary feasibility study(‘17.8)

Development project of zone 5 of agricultural site

  • Business outline: 118.9 billion won /1,513ha
    • ※ ‘12.12.14 final approval of total cost
  • Large scale farming and fishing company, agriculture industry cluster, high-tech agriculture model complex, etc. → Start construction on June 26, 2013 and complete construction in 2017

Agro-park development project

  • Business size : 300ha(900,000 pyeong)
  • Production·process·distribution·export integrated complex of agricultural products
  • Convention center and education center/utility&service support, etc.
    • ※ Agro-park : Large factory farm

Agro-medical development project

  • Business size : 100ha(300,000 pyeong)
  • Create agricultural science·medicine·IT convergence combined industrial complex
  • Haling center by agrifood and agriculture environment → Saemangeum Master Plan(MP) new project reflection(‘14.9)